If you want a new kitchen finished next year, late November is when to start kitchen design. A kitchen that builds in spring or summer needs its design resolved before the builder is ready, and that work begins now.
Why late fall is when to start kitchen design
If your builder plans to start in spring or summer, the kitchen has to be designed, drawn and coordinated before then. A kitchen still being designed when construction is ready to begin either holds up the house or gets built from partial drawings. Neither is a good outcome.
Design is also where a kitchen earns most of its quality. Cabinetry proportions, the alignment of a hood with a window, the line where stone meets wood: these are settled on paper, long before anything is made. Starting in late fall gives each decision room to be made once, with the information it needs. The holidays help too. You are cooking for more people than usual and noticing exactly what your current kitchen does badly.
Permit requirements vary by city and county, and some neighborhoods have HOA or landmark review. Confirm with your city and your HOA what applies to your house and how their review fits your schedule. For kitchens across the Front Range, those answers differ from one jurisdiction to the next.
The seven stages, and what each needs from you
Our kitchen design process has seven stages. Each depends on the one before it, and each asks something different of you. Here is what to have ready.
Discovery
We need to understand how the house works and how you live in it. Bring what you have: existing plans or a survey, photographs of the current kitchen, images of rooms you admire (and ones you don't), and contact details for your architect, builder or interior designer if you have them. Tell us who cooks, how you entertain, what you store and what frustrates you now. Candor at this stage saves revisions later.
Concept
Concept is where alternative layouts are tested and a material direction takes shape. What we need from you is a clear reaction. If something feels wrong, say so, even if you can't yet say why. This is also the stage to settle whether the kitchen stays within its current walls. Moving a wall, enlarging an opening or adding windows changes the house as well as the kitchen, and our architectural planning work resolves those questions with your architect and engineer before any cabinetry is drawn.
Design Development
Here the concept becomes specific: stone, timber, finishes, appliances, lighting, hardware and the interior fittings of drawers and pantries. Your role is to make decisions and keep them. Book a private appointment at our showroom to see materials at full scale, because a small sample cannot tell you how a slab will read across an island. Choose appliances in this stage, down to the model, since cabinetry is built around their exact dimensions and ventilation needs.
Documentation
Documentation turns decisions into drawings that a workshop and a builder can work from: elevations, sections, construction details and coordination with electrical, plumbing and mechanical plans. Review them carefully, ask questions, then sign off. Your architect and builder should review them too. Once these drawings are approved, a change no longer affects a single sheet. It affects materials ordered and work already scheduled.

Craft
During Craft, the cabinetry and millwork are made and the stone is prepared. You will have fewer decisions, but stay available. If you have chosen natural stone, you may want to approve the actual slabs and how the veining is laid out, since every slab differs. Our approach to craft and materials explains why we care about those details. Meanwhile your builder is preparing the room, so keep us and the builder in close contact.
Installation
Installation needs a prepared room and clear access. Agree with your builder on sequencing: which trades finish before cabinetry arrives and which return after. Expect small questions in the field, such as how to handle a wall that is out of plumb, and answer them promptly. Installation is checked against the approved drawings, so the decisions you made earlier are what get built.
Completion
At Completion the kitchen is styled, inspected in detail and handed over. Your part is to look closely, use the room and tell us what isn't right. Ask us to show you how the concealed elements work, from pantry doors to lighting controls.
Where to begin this month
If / then
- If your architect is already drawing the house
- Bring the kitchen in now, so windows, structure and services are planned with it. We explain why in designing a kitchen around architecture.
- If you are renovating within existing walls
- Start with Discovery. Gather plans and photographs, and keep a list of what your current kitchen gets wrong over the holidays.
- If the project may involve structural changes
- Involve your architect and engineer from Concept forward, so structural decisions are made before cabinetry is drawn.
- If your house is subject to HOA or landmark review
- Ask what review applies and when submissions are due before design goes far.
The bottom line
If you want to build in spring or summer, start design this fall. We recommend arriving at Design Development with room to visit the showroom, compare materials and choose appliances without pressure, because that is where hurried decisions do the most lasting damage.